About the Project
This project involved the construction of a new entrance to Block 4 in the Irish Life complex as well as the strip-out and complete Cat-A fit-out of level 1.
- Project Title Block Four
- Client Irish Life
- Category Office Refurbishment
- Location Dublin
Project Summary
Tricon are currently in phase 3 of a three-phase refurbishment and fit-out project on behalf of the Irish Life Group, the project is scheduled for completion in spring 2018.
The works include the complete strip-out of over 6500 sqm of office spaces over 5 floors, the installation and upgrade of existing power and data services, new stud walls, glazed walls and staff canteens, new floor wall and ceiling finishes and the upgrade of passive fire protection throughout the floors. The works will be carried over three phases with phased possession and within an occupied building. Tricon are acting as the lead contractor and PSCS on this project.
Project at a glance
Project Size
6500 sqm
Project Value
€800 K
Client
Irish Life
Design Team – Phase 3
- Urban Solutions – Project Managers
- Fitzgerald Kavanagh & Partners – Architects
- Kerrigan Sheanon Newman – Quantity Surveyors