Irish Life Block 4

About the Project

This project involved the construction of a new entrance to Block 4 in the Irish Life complex as well as the strip-out and complete Cat-A fit-out of level 1.

  • Project Title Block Four
  • Client Irish Life
  • Category Office Refurbishment
  • Location Dublin

Project Summary

Tricon are currently in phase 3 of a three-phase refurbishment and fit-out project on behalf of the Irish Life Group, the project is scheduled for completion in spring 2018.

The works include the complete strip-out of over 6500 sqm of office spaces over 5 floors, the installation and upgrade of existing power and data services, new stud walls, glazed walls and staff canteens, new floor wall and ceiling finishes and the upgrade of passive fire protection throughout the floors. The works will be carried over three phases with phased possession and within an occupied building. Tricon are acting as the lead contractor and PSCS on this project.

Project at a glance

Project Size
6500 sqm

Project Value
€800 K

Client
Irish Life

Design Team – Phase 3

  • Urban Solutions – Project Managers
  • Fitzgerald Kavanagh & Partners – Architects
  •  Kerrigan Sheanon Newman – Quantity Surveyors
PHOTO SHOWS: Block 4 at Irish Life Mall, Talbot Street, Dublin 1. PHOTO: Conor Ó Mearáin

Project Gallery

I am promo text. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.